{"id":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","slug":"applied-digital-harwood-north-dakota","name":"Polaris Forge 2 (Harwood)","aliases":["Polaris Forge 2","Harwood ND campus","Fargo-area AI factory"],"locationId":"0303bddb-9366-4f58-9353-8b3a73500961","lat":46.9944,"lng":-96.8003,"locationPrecision":"exact","landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"MISO","waterSourceNotes":"Applied Digital proprietary closed-loop / waterless cooling design.","servingUtility":null,"acreage":900,"totalBuildingSqft":null,"streetAddress":null,"notes":"~$3B, 280 MW AI campus near Harwood (north of Fargo) on ~900 acres, broke ground Sept 2025, full initial capacity targeted early 2027. 200 MW of critical IT is contracted to an unnamed U.S. investment-grade hyperscaler, which holds a right of first refusal on an additional 800 MW (1 GW total build-out). Power via Minnkota Power Cooperative (MISO); Applied Digital is funding ~$75M in substation/line upgrades that Minnkota will own. Tenant identity and financing draws partly undisclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000048/apld-20260531.htm","date":"2026-07-29","title":"Applied Digital Corp. Form 10-K (FY ended May 31, 2026)","publisher":"SEC EDGAR"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/132/applied-digital-announces-5-billion-ai-factory-lease-with","date":"2025-09-01","title":"Applied Digital Announces $5 Billion AI Factory Lease at Polaris Forge 2","publisher":"Applied Digital (IR)"},{"url":"https://northdakotamonitor.com/2026/03/23/data-center-developer-looks-west-backs-power-upgrades-near-fargo/","date":"2026-03-23","title":"Data center developer looks west, backs power upgrades near Fargo","publisher":"North Dakota Monitor"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:09.184Z","updatedAt":"2026-08-28T14:22:23.508Z","location":{"id":"0303bddb-9366-4f58-9353-8b3a73500961","name":"Harwood","slug":"harwood-north-dakota","kind":"city","parentLocationId":"bf31d9ef-2a43-44da-b221-46b960d19269","region":"North Dakota","lat":46.9944,"lng":-96.8003,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:22:08.806Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"44e245a0-6579-4009-8e21-a55987ee4211","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","companyId":null,"externalName":"Undisclosed U.S. investment-grade hyperscaler","role":"offtaker","structureNotes":"200 MW leased; ROFR on 800 MW","createdAt":"2026-08-17T20:22:13.608Z","company":null},{"id":"02658ada-5c29-46b1-9eb6-2561e072f70b","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","companyId":null,"externalName":"Minnkota Power Cooperative (MISO)","role":"utility","structureNotes":null,"createdAt":"2026-08-17T20:22:14.384Z","company":null},{"id":"ddc11580-668e-4a64-9289-af74b141d5a5","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","companyId":null,"externalName":"Macquarie Asset Management","role":"financier","structureNotes":"Perpetual-preferred financing draws","createdAt":"2026-08-17T20:22:15.158Z","company":null},{"id":"1d65b70b-73a6-4ac2-9d2d-5c5619cc890f","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","companyId":"67278635-e1c4-464f-8e6c-8efedbee2c2c","externalName":"Applied Digital Corporation","role":"developer","structureNotes":"NASDAQ: APLD","createdAt":"2026-08-17T20:22:12.845Z","company":{"id":"67278635-e1c4-464f-8e6c-8efedbee2c2c","name":"Applied Digital","slug":"applied-digital"}},{"id":"d4dbc25f-6f7d-4fb9-b8ce-d62e3ed9eabd","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","companyId":null,"externalName":"Cass County Electric Cooperative","role":"utility","structureNotes":"Co-serving power to the campus alongside Minnkota Power Cooperative.","createdAt":"2026-08-19T01:34:23.091Z","company":null}],"capacityClaims":[{"id":"dedd1777-55b9-4b39-868c-f9cce36c1ec5","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","series":"announced","valueGw":0.28,"asOf":"2025-08-18T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"280 MW initial design, scalable to 1 GW","createdAt":"2026-08-17T20:22:09.867Z"},{"id":"2092de0a-dc01-4673-b78b-91c98ced8eab","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","series":"contracted","valueGw":0.2,"asOf":"2025-09-01T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/132/applied-digital-announces-5-billion-ai-factory-lease-with","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"200 MW critical IT contracted; hyperscaler holds ROFR on +800 MW","createdAt":"2026-08-17T20:22:10.711Z"},{"id":"0fa410ef-68d9-4494-94f1-6426efb0c776","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","series":"under_construction","valueGw":0.28,"asOf":"2026-05-31T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000048/apld-20260531.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"Under construction; part of APLD's ~1.5 GW operating/under-construction disclosure","createdAt":"2026-08-17T20:22:11.560Z"}],"financialClaims":[{"id":"c4c12b64-519a-47d9-9917-1f754447dffa","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","kind":"capex","label":"Polaris Forge 2 total project investment","valueUsd":"3000000000","capUsd":null,"conditions":"Announced total investment for the 280 MW Harwood AI campus.","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-19T01:34:21.564Z"}],"metricClaims":[{"id":"5ce70ae8-42cf-4068-b098-f0c52e7363a6","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","metricType":"jobs_permanent","valueNumeric":200,"valueText":"More than 200 full-time employees plus long-term contractors","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:34:22.336Z"}],"powerProjects":[{"id":"49d2e412-5a62-46fc-ba1a-38fc9defb6ca","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","name":"Harwood substation and high-voltage line (Minnkota Power)","type":"grid_interconnect","capacityGw":0.28,"lifecycleState":"under_construction","sourceUrl":"https://northdakotamonitor.com/2026/03/23/data-center-developer-looks-west-backs-power-upgrades-near-fargo/","evidenceTier":"reported","note":"~$75M in upgrades funded by APLD, owned/operated by Minnkota Power Cooperative","createdAt":"2026-08-17T20:22:12.383Z"}],"facilities":[{"slug":"applied-digital-polaris-forge-2-harwood","name":"Applied Digital Polaris Forge 2","status":"under_construction","criticalItMw":200,"facilityType":"crypto_hpc"}],"incidents":[],"events":[{"id":"6994a354-8328-4c10-b2b7-a4b16994105f","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Cass County Electric Cooperative","occurredAt":"2026-08-19T01:34:23.471Z","createdAt":"2026-08-19T01:34:23.471Z"},{"id":"5df6e42e-5917-487f-9bcd-4a4c70eff34b","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Polaris Forge 2 total project investment","occurredAt":"2026-08-19T01:34:21.942Z","createdAt":"2026-08-19T01:34:21.942Z"},{"id":"caf72b09-8805-453a-b0a0-ed7e59ac2ee9","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Macquarie Asset Management","occurredAt":"2026-08-17T20:22:15.534Z","createdAt":"2026-08-17T20:22:15.534Z"},{"id":"403ff6e7-d8ef-41aa-a206-5cae6cc1a351","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Minnkota Power Cooperative (MISO)","occurredAt":"2026-08-17T20:22:14.774Z","createdAt":"2026-08-17T20:22:14.774Z"},{"id":"4d4a2586-69db-49e2-94f2-d7c16b6e5784","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"offtaker: Undisclosed U.S. investment-grade hyperscaler","occurredAt":"2026-08-17T20:22:14.008Z","createdAt":"2026-08-17T20:22:14.008Z"},{"id":"8a979e29-5fcb-4299-b7eb-6f01943c5f39","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Applied Digital Corporation","occurredAt":"2026-08-17T20:22:13.225Z","createdAt":"2026-08-17T20:22:13.225Z"},{"id":"77d3c7f4-5a0f-43b3-b1c0-2a467b1ee674","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.28","claimId":"0fa410ef-68d9-4494-94f1-6426efb0c776","detail":null,"occurredAt":"2026-08-17T20:22:12.157Z","createdAt":"2026-08-17T20:22:12.157Z"},{"id":"ff7cfbad-dbae-4de5-b560-9a4d84f72689","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.28","claimId":"0fa410ef-68d9-4494-94f1-6426efb0c776","detail":"verified · sec_filing","occurredAt":"2026-08-17T20:22:11.716Z","createdAt":"2026-08-17T20:22:11.716Z"},{"id":"f2959479-be4d-481e-a798-8972ab010dd4","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"0.2","claimId":"2092de0a-dc01-4673-b78b-91c98ced8eab","detail":null,"occurredAt":"2026-08-17T20:22:11.026Z","createdAt":"2026-08-17T20:22:11.026Z"},{"id":"521bf6f4-230f-482f-adf8-7797b583619f","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"0.2","claimId":"2092de0a-dc01-4673-b78b-91c98ced8eab","detail":"claimed · press_release","occurredAt":"2026-08-17T20:22:10.873Z","createdAt":"2026-08-17T20:22:10.873Z"},{"id":"ce16d345-0605-4a41-ae46-6a1f710d0c58","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.28","claimId":"dedd1777-55b9-4b39-868c-f9cce36c1ec5","detail":null,"occurredAt":"2026-08-17T20:22:10.180Z","createdAt":"2026-08-17T20:22:10.180Z"},{"id":"de330d2e-cec8-40d2-ad4b-1f40819fe47d","dataCenterId":"76e69d68-aa5f-4f30-bb67-e5e3acf391d4","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.28","claimId":"dedd1777-55b9-4b39-868c-f9cce36c1ec5","detail":"claimed · press_release","occurredAt":"2026-08-17T20:22:10.020Z","createdAt":"2026-08-17T20:22:10.020Z"}],"capacity_picture":{"announced_gw":0.28,"contracted_gw":0.2,"under_construction_gw":0.28,"energized_gw":null,"announced_minus_energized_gw":0.28,"by_series":{"announced":{"valueGw":0.28,"asOf":"2025-08-18T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge"},"contracted":{"valueGw":0.2,"asOf":"2025-09-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://ir.applieddigital.com/news-events/press-releases/detail/132/applied-digital-announces-5-billion-ai-factory-lease-with"},"under_construction":{"valueGw":0.28,"asOf":"2026-05-31T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://www.sec.gov/Archives/edgar/data/0001144879/000114487926000048/apld-20260531.htm"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Polaris Forge 2 (Harwood)","url":"https://registry.deploy.report/datacenters/applied-digital-harwood-north-dakota","geo":{"@type":"GeoCoordinates","latitude":46.9944,"longitude":-96.8003},"address":{"@type":"PostalAddress","addressLocality":"Harwood"}}}