# Switch Citadel Campus (Tahoe Reno)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 385f1c8a-eb14-4741-8526-9cab49bac9cb
- **Type:** AI data center campus
- **Location:** McCarran (Tahoe Reno Industrial Center), Nevada, United States
- **Lifecycle state:** partially_energized
- **Announced capacity (GW):** 0.65
- **Energized capacity (GW):** 0.13
- **Announced-to-energized gap (GW):** 0.52

## Capacity ledger (append-only, dated, sourced)

- announced: 0.65 GW · claimed · as of 2019-01-01 · https://www.switch.com/switch-tahoe-reno-data-center-now-open/
- energized: 0.13 GW · reported · as of 2019-01-01 · https://www.datacenterknowledge.com/switches-routers/switch-launches-its-first-enormous-reno-data-center

## Parties


## Common questions


**What is Switch Citadel Campus (Tahoe Reno)?**

Switch Citadel Campus (Tahoe Reno) is an AI data center campus tracked on the DEPLOY registry, located in McCarran (Tahoe Reno Industrial Center). DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Switch Citadel Campus (Tahoe Reno) use?**

Switch Citadel Campus (Tahoe Reno) has 0.65 GW of announced capacity on the DEPLOY registry, of which 0.13 GW is recorded as energized, an announced-to-energized gap of 0.52 GW. Each figure is individually dated and sourced.

**Is Switch Citadel Campus (Tahoe Reno) operating yet?**

As of the most recent verification on the DEPLOY registry, Switch Citadel Campus (Tahoe Reno) is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Switch Citadel Campus (Tahoe Reno)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Switch TAHOE RENO Now Open: Largest Data Center Campus in the World: https://www.switch.com/switch-tahoe-reno-data-center-now-open/
- Switch, Inc. Form 8-K investor presentation (FY2018): https://www.sec.gov/Archives/edgar/data/0001710583/000171058318000060/switchinvestorpresentati.htm
- Switch Launches Its First Enormous Reno Data Center: https://www.datacenterknowledge.com/switches-routers/switch-launches-its-first-enormous-reno-data-center
- Switch Will Support Reno Data Center Campus With Reclaimed Water: https://www.datacenterfrontier.com/colocation/article/11427861/switch-will-support-reno-data-center-campus-with-reclaimed-water

Canonical: https://registry.deploy.report/datacenters/switch-citadel-storey-county-nevada
JSON: https://registry.deploy.report/v1/datacenters/switch-citadel-storey-county-nevada