# Poolside Project Horizon (West Texas)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 92f624bd-bd8f-423b-a90b-1e2601a92712
- **Type:** AI data center campus
- **Location:** Fort Stockton, Texas, United States
- **Lifecycle state:** stalled
- **Announced capacity (GW):** 2
- **Energized capacity (GW):** 0
- **Announced-to-energized gap (GW):** 2

## Capacity ledger (append-only, dated, sourced)

- announced: 2 GW · reported · as of 2025-10-15 · https://www.datacenterfrontier.com/machine-learning/article/55326541/how-coreweave-and-poolside-are-teaming-up-in-west-texas-to-build-the-next-generation-of-ai-data-centers
- contracted: 0.25 GW · reported · as of 2025-10-15 · https://www.datacenterfrontier.com/machine-learning/article/55326541/how-coreweave-and-poolside-are-teaming-up-in-west-texas-to-build-the-next-generation-of-ai-data-centers
- energized: 0 GW · reported · as of 2026-04-01 · https://mlq.ai/news/coreweave-ends-2-gw-texas-data-center-deal-with-poolside/

## Parties

- CoreWeave (offtaker): https://registry.deploy.report/companies/coreweave

## Common questions


**What is Poolside Project Horizon (West Texas)?**

Poolside Project Horizon (West Texas) is an AI data center campus tracked on the DEPLOY registry, located in Fort Stockton. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Poolside Project Horizon (West Texas) use?**

Poolside Project Horizon (West Texas) has 2 GW of announced capacity on the DEPLOY registry, of which 0 GW is recorded as energized, an announced-to-energized gap of 2 GW. Each figure is individually dated and sourced.

**Is Poolside Project Horizon (West Texas) operating yet?**

As of the most recent verification on the DEPLOY registry, Poolside Project Horizon (West Texas) is stalled. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Poolside Project Horizon (West Texas)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- How CoreWeave and Poolside Are Teaming Up in West Texas to Build the Next Generation of AI Data Centers: https://www.datacenterfrontier.com/machine-learning/article/55326541/how-coreweave-and-poolside-are-teaming-up-in-west-texas-to-build-the-next-generation-of-ai-data-centers
- CoreWeave Announces Partnership with Foundation Model Company Poolside to Deliver AI Cloud Services: https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Partnership-with-Foundation-Model-Company-Poolside-to-Deliver-AI-Cloud-Services/default.aspx
- Plans Unveiled for 2 GW Artificial Intelligence Campus in West Texas: https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas
- AI startup Poolside teams up with CoreWeave on 2GW data center in Texas: https://www.datacenterdynamics.com/en/news/ai-startup-poolside-teams-up-with-coreweave-on-2gw-data-center-in-texas/
- CoreWeave Ends 2 GW Texas Data Center Deal With Poolside: https://mlq.ai/news/coreweave-ends-2-gw-texas-data-center-deal-with-poolside/

Canonical: https://registry.deploy.report/datacenters/poolside-project-horizon-pecos-texas
JSON: https://registry.deploy.report/v1/datacenters/poolside-project-horizon-pecos-texas
