# Stargate Saline Township (OpenAI / Oracle / Related Digital)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 62a538a8-7354-4051-8f41-c9c1b866510e
- **Type:** AI data center campus
- **Location:** Saline Township, Michigan, United States
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 1
- **Energized capacity (GW):** 0
- **Announced-to-energized gap (GW):** 1

## Capacity ledger (append-only, dated, sourced)

- announced: 1 GW · verified · as of 2025-10-30 · https://www.prnewswire.com/news-releases/openai-oracle-and-related-digital-announce-stargate-data-center-site-in-michigan-302600302.html
- contracted: 1.4 GW · reported · as of 2026-06-15 · https://www.tomshardware.com/tech-industry/michigan-towns-rush-to-block-ai-data-centers-after-16-billion-stargate-project-overrode-local-opposition
- energized: 0 GW · reported · as of 2026-01-20 · https://www.datacenterdynamics.com/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/

## Parties

- Oracle (operator): https://registry.deploy.report/companies/oracle
- Stargate Infrastructure (developer): https://registry.deploy.report/companies/stargate-infrastructure

## Common questions


**What is Stargate Saline Township (OpenAI / Oracle / Related Digital)?**

Stargate Saline Township (OpenAI / Oracle / Related Digital) is an AI data center campus tracked on the DEPLOY registry, located in Saline Township. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Stargate Saline Township (OpenAI / Oracle / Related Digital) use?**

Stargate Saline Township (OpenAI / Oracle / Related Digital) has 1 GW of announced capacity on the DEPLOY registry, of which 0 GW is recorded as energized, an announced-to-energized gap of 1 GW. Each figure is individually dated and sourced.

**Is Stargate Saline Township (OpenAI / Oracle / Related Digital) operating yet?**

As of the most recent verification on the DEPLOY registry, Stargate Saline Township (OpenAI / Oracle / Related Digital) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Stargate Saline Township (OpenAI / Oracle / Related Digital)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- OpenAI, Oracle, and Related Digital Announce Stargate Data Center Site in Michigan: https://www.prnewswire.com/news-releases/openai-oracle-and-related-digital-announce-stargate-data-center-site-in-michigan-302600302.html
- Expanding Stargate to Michigan: https://openai.com/index/expanding-stargate-to-michigan/
- Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan: https://www.datacenterdynamics.com/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/
- Michigan towns rush to block AI data centers after $16 billion Stargate project (1.4 GW power supply): https://www.tomshardware.com/tech-industry/michigan-towns-rush-to-block-ai-data-centers-after-16-billion-stargate-project-overrode-local-opposition

Canonical: https://registry.deploy.report/datacenters/openai-oracle-stargate-saline-michigan
JSON: https://registry.deploy.report/v1/datacenters/openai-oracle-stargate-saline-michigan
