# Meta Hyperion Data Center (Richland Parish)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 89efdd2f-1ec9-47a1-bb7c-a1ad597bc991
- **Type:** AI data center campus
- **Location:** Delhi, Louisiana, United States
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 5
- **Energized capacity (GW):** 0
- **Announced-to-energized gap (GW):** 5

## Capacity ledger (append-only, dated, sourced)

- announced: 5 GW · claimed · as of 2026-07-13 · https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/
- energized: 0 GW · reported · as of 2026-08-17 · https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/
- under_construction: 2 GW · claimed · as of 2026-07-13 · https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html

## Parties

- Meta Platforms (developer): https://registry.deploy.report/companies/meta-platforms
- Meta Platforms (tenant): https://registry.deploy.report/companies/meta-platforms

## Common questions


**What is Meta Hyperion Data Center (Richland Parish)?**

Meta Hyperion Data Center (Richland Parish) is an AI data center campus tracked on the DEPLOY registry, located in Delhi. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Meta Hyperion Data Center (Richland Parish) use?**

Meta Hyperion Data Center (Richland Parish) has 5 GW of announced capacity on the DEPLOY registry, of which 0 GW is recorded as energized, an announced-to-energized gap of 5 GW. Each figure is individually dated and sourced.

**Is Meta Hyperion Data Center (Richland Parish) operating yet?**

As of the most recent verification on the DEPLOY registry, Meta Hyperion Data Center (Richland Parish) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Meta Hyperion Data Center (Richland Parish)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Deepening our investment in Richland Parish, Louisiana: https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/
- Meta's Louisiana data center investment to reach $50 billion: https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html
- Meta orders 10 gas-fired power plants for its Hyperion AI campus: https://fortune.com/2026/03/27/meta-hyperion-10-gas-power-plants-louisiana-entergy/
- Entergy Louisiana Says 7 More Gas Plants Necessary for Meta Data Center: https://www.rtoinsider.com/129344-entergy-7-more-gas-plants-necessary-meta-data-center/
- Richland Parish Data Center: https://datacenters.atmeta.com/richland-parish-data-center/
- Entergy to build $1.2bn 500kV transmission line to serve Meta mega data center in Louisiana: https://www.datacenterdynamics.com/en/news/entergy-to-build-12bn-500kv-transmission-line-to-serve-meta-mega-data-center-in-louisiana/
- Entergy Louisiana receives LPSC approval for major infrastructure investments to support Meta's data center: https://www.entergy.com/news/entergy-louisiana-receives-lpsc-approval-for-major-infrastructure-investments-to-support-metas-data-center-and-improve-reliability
- Meta's AI bond just hit a record low as its stock soared: https://protos.com/metas-ai-bond-just-hit-a-record-low-as-its-stock-soared/
- Meta Hyperion ~$27.3B bonds reportedly ~94.4¢ (secondary X): https://x.com/akburtonto/status/2102853172243083426