# Meta Eagle Mountain Data Center Campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** a76e96bd-5e07-444b-ba92-4995dcb78add
- **Type:** AI data center campus
- **Location:** Eagle Mountain, Utah, United States
- **Lifecycle state:** partially_energized
- **Announced capacity (GW):** 1.8
- **Energized capacity (GW):** 0.2
- **Announced-to-energized gap (GW):** 1.6

## Capacity ledger (append-only, dated, sourced)

- announced: 1.8 GW · claimed · as of 2025-11-21 · https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/
- energized: 0.2 GW · reported · as of 2025-02-01 · https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Eagle-Mountain-Data-Center.pdf

## Parties

- Meta Platforms (operator): https://registry.deploy.report/companies/meta-platforms

## Common questions


**What is Meta Eagle Mountain Data Center Campus?**

Meta Eagle Mountain Data Center Campus is an AI data center campus tracked on the DEPLOY registry, located in Eagle Mountain. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Meta Eagle Mountain Data Center Campus use?**

Meta Eagle Mountain Data Center Campus has 1.80 GW of announced capacity on the DEPLOY registry, of which 0.20 GW is recorded as energized, an announced-to-energized gap of 1.60 GW. Each figure is individually dated and sourced.

**Is Meta Eagle Mountain Data Center Campus operating yet?**

As of the most recent verification on the DEPLOY registry, Meta Eagle Mountain Data Center Campus is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Meta Eagle Mountain Data Center Campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Facebook parent Meta announces mega expansion to Eagle Mountain data center project: https://www.deseret.com/utah/2022/9/30/23380151/facebook-meta-announces-expansion-eagle-mountain-data-center-tax-breaks/
- Utah's largest solar plant becomes operational, set to power Eagle Mountain data center: https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/
- Utah County, We Are Online!: https://datacenters.atmeta.com/2021/07/utah-county-we-are-online/

Canonical: https://registry.deploy.report/datacenters/meta-eagle-mountain-utah
JSON: https://registry.deploy.report/v1/datacenters/meta-eagle-mountain-utah
