# Meta Beaver Dam Data Center

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 862aafbc-2b12-4754-90c0-23933b2ab1f4
- **Type:** AI data center campus
- **Location:** Beaver Dam, Wisconsin, United States
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 0.22

## Capacity ledger (append-only, dated, sourced)

- announced: 0.22 GW · reported · as of 2026-06-01 · https://www.wpr.org/news/wisconsin-regulators-approve-rates-for-metas-beaver-dam-data-center-with-sharp-criticism
- contracted: 0.22 GW · verified · as of 2026-05-07 · https://www.wisbusiness.com/2026/new-details-revealed-for-metas-beaver-dam-data-center/

## Parties

- Meta Platforms (operator): https://registry.deploy.report/companies/meta-platforms

## Common questions


**What is Meta Beaver Dam Data Center?**

Meta Beaver Dam Data Center is an AI data center campus tracked on the DEPLOY registry, located in Beaver Dam. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Meta Beaver Dam Data Center use?**

Meta Beaver Dam Data Center has 0.22 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Is Meta Beaver Dam Data Center operating yet?**

As of the most recent verification on the DEPLOY registry, Meta Beaver Dam Data Center is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Meta Beaver Dam Data Center?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- PSC approves Alliant-Meta data center power deal while criticizing 'black box' approach: https://wisconsinwatch.org/2026/05/psc-approves-alliant-meta-data-center-power-deal-while-criticizing-black-box-approach/
- New details revealed for Meta's Beaver Dam data center: https://www.wisbusiness.com/2026/new-details-revealed-for-metas-beaver-dam-data-center/

Canonical: https://registry.deploy.report/datacenters/meta-beaver-dam-wisconsin