# HUMAIN (Riyadh & Dammam flagship data centers)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 68549634-6d59-45db-864b-212966f675e3
- **Type:** AI data center campus
- **Location:** Riyadh, Riyadh Province, Saudi Arabia
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 1.9
- **Energized capacity (GW):** 0
- **Announced-to-energized gap (GW):** 1.9

## Capacity ledger (append-only, dated, sourced)

- announced: 1.9 GW · claimed · as of 2026-01-01 · https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/
- energized: 0 GW · reported · as of 2026-07-31 · https://vision2030.ai/analysis/humain-data-centers-riyadh-dammam-status/
- under_construction: 0.2 GW · reported · as of 2026-01-01 · https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/

## Parties

- HUMAIN (developer): https://registry.deploy.report/companies/humain

## Common questions


**What is HUMAIN (Riyadh & Dammam flagship data centers)?**

HUMAIN (Riyadh & Dammam flagship data centers) is an AI data center campus tracked on the DEPLOY registry, located in Riyadh. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will HUMAIN (Riyadh & Dammam flagship data centers) use?**

HUMAIN (Riyadh & Dammam flagship data centers) has 1.90 GW of announced capacity on the DEPLOY registry, of which 0 GW is recorded as energized, an announced-to-energized gap of 1.90 GW. Each figure is individually dated and sourced.

**Is HUMAIN (Riyadh & Dammam flagship data centers) operating yet?**

As of the most recent verification on the DEPLOY registry, HUMAIN (Riyadh & Dammam flagship data centers) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on HUMAIN (Riyadh & Dammam flagship data centers)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Humain breaks ground two data centers, first facilities expected Q2 2026: https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/
- Saudi AI venture Humain buys 18,000 Nvidia GB300 chips: https://www.datacenterdynamics.com/en/news/saudi-arabian-ai-venture-humain-buys-18000-nvidia-gb300-chips-several-hundred-thousand-more-on-the-way/
- Nvidia to send 18,000 AI GPUs to Saudi Arabia's state-backed AI data centers: https://www.tomshardware.com/pc-components/gpus/nvidia-sending-18-000-ai-gpus-to-saudi-arabias-state-backed-ai-data-centers-in-wake-of-cancelled-export-rules
- PIF-backed Humain secures up to $1.2bn to expand AI infrastructure: https://www.arabnews.com/node/2630217/business-economy

Canonical: https://registry.deploy.report/datacenters/humain-saudi-arabia
JSON: https://registry.deploy.report/v1/datacenters/humain-saudi-arabia
