# Homer City Energy Campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 1c60d653-887c-4221-ac49-ed56853a4c66
- **Type:** AI data center campus
- **Location:** Homer City, Pennsylvania, United States
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 4.5
- **Energized capacity (GW):** 0
- **Announced-to-energized gap (GW):** 4.5

## Capacity ledger (append-only, dated, sourced)

- announced: 4.5 GW · claimed · as of 2025-04-02 · https://www.enerdata.net/publications/daily-energy-news/ge-vernova-wins-turbine-order-45-gw-gas-powered-data-center-campus-us.html-0
- energized: 0 GW · reported · as of 2026-08-17 · https://www.datacenterdynamics.com/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania/

## Parties


## Common questions


**What is Homer City Energy Campus?**

Homer City Energy Campus is an AI data center campus tracked on the DEPLOY registry, located in Homer City. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Homer City Energy Campus use?**

Homer City Energy Campus has 4.50 GW of announced capacity on the DEPLOY registry, of which 0 GW is recorded as energized, an announced-to-energized gap of 4.50 GW. Each figure is individually dated and sourced.

**Is Homer City Energy Campus operating yet?**

As of the most recent verification on the DEPLOY registry, Homer City Energy Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Homer City Energy Campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Project Overview | Homer City Redevelopment: https://www.homercityredevelopment.com/project-overview
- Largest US gas-fired power plant planned for data centers in Pennsylvania: https://www.utilitydive.com/news/homer-city-gas-fired-power-station-data-center-firstenergy/744332/
- GE Vernova wins turbine order for 4.5 GW gas-powered data center campus (US): https://www.enerdata.net/publications/daily-energy-news/ge-vernova-wins-turbine-order-45-gw-gas-powered-data-center-campus-us.html-0
- Former Homer City Plant to Become a $10 Billion AI Data Center Campus: https://constructionreviewonline.com/former-homer-city-plant-to-become-a-10-billion-ai-data-center-campus/
- In Western Pennsylvania, a former coal town gets a gas-fired data center: https://www.alleghenyfront.org/pennsylvania-homer-city-power-plant-data-center/
- Homer City power plant water usage remains unclear: https://community.triblive.com/news/4050093

Canonical: https://registry.deploy.report/datacenters/homer-city-pennsylvania
JSON: https://registry.deploy.report/v1/datacenters/homer-city-pennsylvania
