# Project Southgate (Bell Bay, Tasmania)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** cbdcd366-86df-4693-ba5d-e81d4a74d21d
- **Type:** AI data center campus
- **Operator / developer:** [Sustainable Metal Cloud](/companies/sustainable-metal-cloud.md)
- **Location:** Bell Bay, Tasmania, Australia
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 0.288

## Capacity ledger (append-only, dated, sourced)

- announced: 0.288 GW · reported · as of 2025-10-16 · https://firmus.co/infrastructure/southgate/project-southgate-faqs

## Parties

- Sustainable Metal Cloud (operator): https://registry.deploy.report/companies/sustainable-metal-cloud

## Common questions


**What is Project Southgate (Bell Bay, Tasmania)?**

Project Southgate (Bell Bay, Tasmania) is an AI data center campus tracked on the DEPLOY registry, located in Bell Bay, Tasmania, Australia. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Project Southgate (Bell Bay, Tasmania) use?**

Project Southgate (Bell Bay, Tasmania) has 0.29 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building Project Southgate (Bell Bay, Tasmania)?**

Sustainable Metal Cloud is recorded as a party to Project Southgate (Bell Bay, Tasmania) on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Project Southgate (Bell Bay, Tasmania) operating yet?**

As of the most recent verification on the DEPLOY registry, Project Southgate (Bell Bay, Tasmania) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Project Southgate (Bell Bay, Tasmania)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Project Southgate Bell Bay: FAQs: https://firmus.co/infrastructure/southgate/project-southgate-faqs
- Firmus partners CDC on Southgate to scale to 1.6 GW: https://w.media/firmus-partners-cdc-on-southgate-to-scale-to-1-6-gw/