# Hut 8 Beacon Point

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** 9425a636-de34-4e7a-9717-0926dde029c2
- **Type:** AI data center facility
- **Operator:** [Hut 8](/companies/hut-8.md)
- **Location:** Corpus Christi
- **Status:** under_construction
- **Facility type:** crypto hpc
- **Critical IT (MW):** 352
- **Operational year:** 2027
- **Serving utility:** AEP Texas

## Evidence (each fact, sourced)

- critical_it_mw: 352 · reported · https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html
- record: Hut 8 Beacon Point · reported · https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html

## Common questions


**What is Hut 8 Beacon Point?**

Hut 8 Beacon Point is a data center facility record on the DEPLOY registry, in Corpus Christi. Every fact on the record is individually sourced and dated.

**Who operates Hut 8 Beacon Point?**

Hut 8 operates Hut 8 Beacon Point, per the sourced record on the DEPLOY registry.

**Is Hut 8 Beacon Point operating?**

Hut 8 Beacon Point is recorded as under construction on the DEPLOY registry, with 352 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on Hut 8 Beacon Point?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/hut8-beacon-point-corpus-christi
JSON: https://registry.deploy.report/v1/datacenters/facilities/hut8-beacon-point-corpus-christi
