# Edged Irving Building 2

Data center facility record on DEPLOY. Every fact is individually sourced and dated.

- **Canonical ID:** 21b13faa-d6cd-4466-8e9e-d4e31d6248f4
- **Type:** AI data center facility
- **Operator:** [Edged Energy](/companies/edged-energy.md)
- **Location:** Irving
- **Address:** North Wildwood Drive, Irving, TX
- **Status:** under_construction
- **Facility type:** colocation
- **Critical IT (MW):** 24

## Evidence (each fact, sourced)

- criticalItMw: 24 · reported · https://rejournals.com/edged-us-adds-second-ai-data-center-to-campus-in-irving/
- record: Edged Irving Building 2 · reported · https://www.datacenterdynamics.com/en/news/edged-secures-permission-for-second-data-center-at-irving-campus-texas/
- status: under_construction (second building approved Jan 2026) · reported · https://www.datacenterdynamics.com/en/news/edged-secures-permission-for-second-data-center-at-irving-campus-texas/
- streetAddress: North Wildwood Drive, Irving, TX · reported · https://rejournals.com/edged-us-adds-second-ai-data-center-to-campus-in-irving/

## Common questions


**What is Edged Irving Building 2?**

Edged Irving Building 2 is a data center facility record on the DEPLOY registry, in Irving. Every fact on the record is individually sourced and dated.

**Who operates Edged Irving Building 2?**

Edged Energy operates Edged Irving Building 2, per the sourced record on the DEPLOY registry.

**Is Edged Irving Building 2 operating?**

Edged Irving Building 2 is recorded as under construction on the DEPLOY registry, with 24 MW of critical IT capacity. Each figure traces to a source.

**How verified is the data on Edged Irving Building 2?**

A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Canonical: https://registry.deploy.report/datacenters/facilities/edged-irving-building-2-tx
JSON: https://registry.deploy.report/v1/datacenters/facilities/edged-irving-building-2-tx
