# EdgeConneX / PowerConneX New Albany Energy Center

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** e3275f41-fe39-4e59-9e65-90b39478283d
- **Type:** AI data center campus
- **Operator / developer:** [EdgeConneX](/companies/edgeconnex.md)
- **Location:** New Albany, Ohio, United States
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 0.14

## Capacity ledger (append-only, dated, sourced)

- announced: 0.14 GW · reported · as of 2025-07-22 · https://www.edgeconnex.com/pcx-new-albany-energy-center/
- under_construction: 0.14 GW · verified · as of 2025-09-01 · https://www.edgeconnex.com/pcx-new-albany-energy-center/

## Parties

- EdgeConneX (operator): https://registry.deploy.report/companies/edgeconnex

## Common questions


**What is EdgeConneX / PowerConneX New Albany Energy Center?**

EdgeConneX / PowerConneX New Albany Energy Center is an AI data center campus tracked on the DEPLOY registry, located in New Albany. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will EdgeConneX / PowerConneX New Albany Energy Center use?**

EdgeConneX / PowerConneX New Albany Energy Center has 0.14 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building EdgeConneX / PowerConneX New Albany Energy Center?**

EdgeConneX is recorded as a party to EdgeConneX / PowerConneX New Albany Energy Center on the DEPLOY registry. The full party list, with each role, is on the record.

**Is EdgeConneX / PowerConneX New Albany Energy Center operating yet?**

As of the most recent verification on the DEPLOY registry, EdgeConneX / PowerConneX New Albany Energy Center is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on EdgeConneX / PowerConneX New Albany Energy Center?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- PCX New Albany Energy Center: https://www.edgeconnex.com/pcx-new-albany-energy-center/
- OPSB approves natural gas plant to power data center in Licking County: https://www.farmanddairy.com/news/opsb-approves-natural-gas-plant-to-power-data-center-in-licking-county/899062.html

Canonical: https://registry.deploy.report/datacenters/edgeconnex-pcx-new-albany-ohio