# EdgeConneX Cedar Creek Campus (CoreWeave AUS02)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9
- **Type:** AI data center campus
- **Operator / developer:** [EdgeConneX](/companies/edgeconnex.md)
- **Location:** Cedar Creek, Bastrop, Texas, United States
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 0.096

## Capacity ledger (append-only, dated, sourced)

- announced: 0.096 GW · claimed · as of 2025-04-01 · https://www.edgeconnex.com/wp-content/uploads/2025/01/Austin-Data-Sheet-April-2025.pdf

## Parties

- EdgeConneX (developer): https://registry.deploy.report/companies/edgeconnex
- CoreWeave (tenant): https://registry.deploy.report/companies/coreweave

## Common questions


**What is EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?**

EdgeConneX Cedar Creek Campus (CoreWeave AUS02) is an AI data center campus tracked on the DEPLOY registry, located in Cedar Creek. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will EdgeConneX Cedar Creek Campus (CoreWeave AUS02) use?**

EdgeConneX Cedar Creek Campus (CoreWeave AUS02) has 0.10 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?**

EdgeConneX is recorded as a party to EdgeConneX Cedar Creek Campus (CoreWeave AUS02) on the DEPLOY registry. The full party list, with each role, is on the record.

**Is EdgeConneX Cedar Creek Campus (CoreWeave AUS02) operating yet?**

As of the most recent verification on the DEPLOY registry, EdgeConneX Cedar Creek Campus (CoreWeave AUS02) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- AI cloud company CoreWeave to fill $440M Cedar Creek data center: https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/
- EdgeConneX Austin Data Center | Colocation & Connectivity: https://www.edgeconnex.com/locations/americas/austin-texas/
- EdgeConneX Austin Data Sheet (April 2025): https://www.edgeconnex.com/wp-content/uploads/2025/01/Austin-Data-Sheet-April-2025.pdf
- CoreWeave to lease capacity from EdgeConneX at data center campus in Cedar Creek, Texas: https://www.datacenterdynamics.com/en/news/coreweave-to-lease-capacity-from-edgeconnex-at-data-center-campus-in-cedar-creek-texas/
- Four Cedar Creek data centers represent $2.8 billion development: https://texreporter.com/2026/09/02/four-cedar-creek-data-centers-represent-2-8-billion-development/

Canonical: https://registry.deploy.report/datacenters/edgeconnex-cedar-creek-texas
JSON: https://registry.deploy.report/v1/datacenters/edgeconnex-cedar-creek-texas