# Drax Power Station Data Centre

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** ad9bed0b-380b-49ee-a8fa-39a79270e483
- **Type:** AI data center campus
- **Operator / developer:** [Drax Group](/companies/drax-group.md)
- **Location:** Drax Power Station, North Yorkshire
- **Lifecycle state:** announced
- **Announced capacity (GW):** 0.1

## Capacity ledger (append-only, dated, sourced)

- announced: 0.1 GW · claimed · as of 2026-11-03 · https://www.drax.com/news/drax-brookfield-and-radiant-announce-20bn-partnership-to-deliver-gw-scale-data-centre-capacity-at-drax-power-station/

## Parties

- Drax Group (developer): https://registry.deploy.report/companies/drax-group
- Radiant (Brookfield) (developer): https://registry.deploy.report/companies/radiant-brookfield-ai

## Common questions


**What is Drax Power Station Data Centre?**

Drax Power Station Data Centre is an AI data center campus tracked on the DEPLOY registry, located in Drax Power Station, North Yorkshire. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Drax Power Station Data Centre use?**

Drax Power Station Data Centre has 0.10 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building Drax Power Station Data Centre?**

Drax Group is recorded as a party to Drax Power Station Data Centre on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Drax Power Station Data Centre operating yet?**

As of the most recent verification on the DEPLOY registry, Drax Power Station Data Centre is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Drax Power Station Data Centre?**

This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Drax, Brookfield, Radiant and Qai announce £20bn partnership to deliver GW-scale data centre capacity at Drax Power Station: https://www.drax.com/news/drax-brookfield-and-radiant-announce-20bn-partnership-to-deliver-gw-scale-data-centre-capacity-at-drax-power-station/

Canonical: https://registry.deploy.report/datacenters/drax-power-station-data-centre
JSON: https://registry.deploy.report/v1/datacenters/drax-power-station-data-centre
