# Project Jade (Crusoe / Tallgrass) AI Data Center Campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 8848cb50-2254-4805-99ad-f2236513df2c
- **Type:** AI data center campus
- **Location:** Cheyenne, Wyoming, United States
- **Lifecycle state:** permitted
- **Announced capacity (GW):** 10

## Capacity ledger (append-only, dated, sourced)

- announced: 10 GW · reported · as of 2026-01-01 · https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/
- announced: 1.8 GW · reported · as of 2025-07-24 · https://www.crusoe.ai/resources/newsroom/crusoe-and-tallgrass-announce-ai-data-center-in-wyoming

## Parties

- Crusoe (developer): https://registry.deploy.report/companies/crusoe

## Common questions


**What is Project Jade (Crusoe / Tallgrass) AI Data Center Campus?**

Project Jade (Crusoe / Tallgrass) AI Data Center Campus is an AI data center campus tracked on the DEPLOY registry, located in Cheyenne. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Project Jade (Crusoe / Tallgrass) AI Data Center Campus use?**

Project Jade (Crusoe / Tallgrass) AI Data Center Campus has 10 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Is Project Jade (Crusoe / Tallgrass) AI Data Center Campus operating yet?**

As of the most recent verification on the DEPLOY registry, Project Jade (Crusoe / Tallgrass) AI Data Center Campus is permitted. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Project Jade (Crusoe / Tallgrass) AI Data Center Campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Wyoming Approves Data Center Campus That Includes 2.7 GW of New Natural Gas-Fired Generation: https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/
- Crusoe and Tallgrass announce AI data center in Wyoming: https://www.crusoe.ai/resources/newsroom/crusoe-and-tallgrass-announce-ai-data-center-in-wyoming

Canonical: https://registry.deploy.report/datacenters/crusoe-tallgrass-project-jade-cheyenne
JSON: https://registry.deploy.report/v1/datacenters/crusoe-tallgrass-project-jade-cheyenne