# Core Scientific / CoreWeave Muskogee HPC Campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 6db978fa-8c95-4c64-96a1-0a4271e38943
- **Type:** AI data center campus
- **Operator / developer:** [Core Scientific](/companies/core-scientific.md)
- **Location:** Muskogee, Muskogee County, Oklahoma, United States
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 1.5

## Capacity ledger (append-only, dated, sourced)

- announced: 1.5 GW · claimed · as of 2025-06-01 · https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/
- under_construction: 0.07 GW · verified · as of 2024-11-18 · https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center
- under_construction: 0.1 GW · reported · as of 2024-06-01 · https://www.okcommerce.gov/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/

## Parties

- Core Scientific (developer): https://registry.deploy.report/companies/core-scientific
- NVIDIA (chip_supplier): https://registry.deploy.report/companies/nvidia
- CoreWeave (tenant): https://registry.deploy.report/companies/coreweave

## Common questions


**What is Core Scientific / CoreWeave Muskogee HPC Campus?**

Core Scientific / CoreWeave Muskogee HPC Campus is an AI data center campus tracked on the DEPLOY registry, located in Muskogee. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Core Scientific / CoreWeave Muskogee HPC Campus use?**

Core Scientific / CoreWeave Muskogee HPC Campus has 1.50 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building Core Scientific / CoreWeave Muskogee HPC Campus?**

Core Scientific is recorded as a party to Core Scientific / CoreWeave Muskogee HPC Campus on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Core Scientific / CoreWeave Muskogee HPC Campus operating yet?**

As of the most recent verification on the DEPLOY registry, Core Scientific / CoreWeave Muskogee HPC Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Core Scientific / CoreWeave Muskogee HPC Campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- DCD: CoreWeave and Core Scientific break ground in Muskogee: https://www.datacenterdynamics.com/en/news/coreweave-and-core-scientific-break-ground-on-100mw-data-center-in-muskogee-oklahoma/
- Oklahoma Commerce: Muskogee 100 MW HPC groundbreaking: https://www.okcommerce.gov/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/
- Blockspace: Core Scientific Oklahoma expansion: https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/
- Muskogee Data Center power station: https://www.gem.wiki/Muskogee_Data_Center_power_station
- Core Scientific acquires cryptomine in Muskogee to expand AI data center campus: https://www.datacenterdynamics.com/en/news/core-scientific-acquires-cryptomine-in-muskogee-to-expand-ai-data-center-campus/
- Core Scientific Acquires Polaris Technologies & 440 MW Grid Connection: https://energy.media/energy-deals/core-scientific-acquires-polaris-technologies-440-mw-grid-connection/
- Oklahoma Data Center | High-Density in Muskogee: https://corescientific.com/high-density-data-centers/muskogee-ok/

Canonical: https://registry.deploy.report/datacenters/coreweave-core-scientific-muskogee-oklahoma
JSON: https://registry.deploy.report/v1/datacenters/coreweave-core-scientific-muskogee-oklahoma
