# Project Kilby (Chevron / Microsoft)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 665b9f79-cb24-42f4-ade4-af461047459d
- **Type:** AI data center campus
- **Location:** Pecos, Texas, United States
- **Lifecycle state:** announced
- **Announced capacity (GW):** 2.7

## Capacity ledger (append-only, dated, sourced)

- announced: 2.7 GW · reported · as of 2026-06-22 · https://www.cnbc.com/2026/06/22/chevron-cvx-microsoft-msft-natural-gas-data-center.html
- announced: 2.67 GW · reported · as of 2026-06-22 · https://www.chevron.com/newsroom/2026/q2/chevron-signs-20-year-power-agreement-with-microsoft-for-west-texas-data-center

## Parties

- Chevron Corporation (developer): https://registry.deploy.report/companies/chevron

## Common questions


**What is Project Kilby (Chevron / Microsoft)?**

Project Kilby (Chevron / Microsoft) is an AI data center campus tracked on the DEPLOY registry, located in Pecos. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Project Kilby (Chevron / Microsoft) use?**

Project Kilby (Chevron / Microsoft) has 2.70 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Is Project Kilby (Chevron / Microsoft) operating yet?**

As of the most recent verification on the DEPLOY registry, Project Kilby (Chevron / Microsoft) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Project Kilby (Chevron / Microsoft)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Chevron Signs 20-Year Power Agreement with Microsoft for West Texas Data Center: https://www.chevron.com/newsroom/2026/q2/chevron-signs-20-year-power-agreement-with-microsoft-for-west-texas-data-center
- Chevron to fuel massive Microsoft data center in Texas using natural gas: https://www.cnbc.com/2026/06/22/chevron-cvx-microsoft-msft-natural-gas-data-center.html
- Kilby power plant: https://www.gem.wiki/Kilby_power_plant
- Gas-Fired Power Generation for AI Data Centers: https://kilby.com/project/

Canonical: https://registry.deploy.report/datacenters/chevron-project-kilby-reeves-texas
JSON: https://registry.deploy.report/v1/datacenters/chevron-project-kilby-reeves-texas